Blog
Articles on grinding, blending and packing food raw materials, toll processing arrangements and the documentation they require.
-
Reprocessing 70 tonnes of caked glycine and reusing the original manufacturer’s bags
A 70-tonne glycine batch: preliminary crushing, staged size reduction and repacking into 25 kg quantities while retaining the original bags.
-
Toll processing agreements: what to specify
A guide to toll processing under Chapter 37 of the Russian Civil Code: yields, losses, acceptance, product return and accompanying documents.
-
Caked powder: restoring flowability and saleable condition
Why powders cake in transit, what to check before crushing and when reprocessing will not restore product quality.